On Tuesday, 12th August 2025, Electrician Senthuran, assisted by his helper, continued work at the new build at Salli Kaadu. Their tasks included installing electrical socket points and light switches, chasing the walls, and running electrical wires through plastic pipes/conduits. Senthuran worked on these installations throughout the day.
Summary:
Senthuran and his helper progressed with electrical installations at the Salli Kaadu new build, including socket points, switches, and conduit wiring.